Showing posts with label Spa. Show all posts
Showing posts with label Spa. Show all posts

31 March, 2012

Photo a Day Challenge - Day 90 Somewhere you relax

This one is really a 'no-brainer'... Its my SPA!!!


Aussie Backyard Spa-house

Hoo roo for now...

------

19 November, 2009

Spa Repair

As it is getting hotter in town, and after doing a water change last week, the spa developed a problem... The circulation pump, which actually pumps water through the filter, went 'belly-up'! So I took it out, and off I went to the Poll and Spa shop only to find out that, even though the parent company Monarch, had gone out of business, the circulation pump was actually a cheap Chinese import, and that a NEW one (that will not match existing plumbing OR union joints) will need to be sourced, grrrrrr!

So the search began (by the pool shop) to find a newbie, and I headed on my way. That was Tuesday. This morning though, with the temp heading north of 35 today and 40+ over the next two days, I got a call telling me my pump was in, an Aussie one and everything will match up, YEAH!

So I drove to the shop, and the first thing I saw was that the end of the electrical cable was wrong, but I think I can make do with that... Simply open up the electrical box and swap it for the one on the old pump, right? Simple? Sure was!!!

Old (left)_New (right), originally uploaded by AussiePomm.
Inside spa circ pump removed, originally uploaded by AussiePomm.
Spa Circuit Board, originally uploaded by AussiePomm.
Job Finished, originally uploaded by AussiePomm.

As you can see, the Supervisory Cat was on duty...

Watch Cat, originally uploaded by AussiePomm.

Whilst all of this was going on, me outside in the heat, where was Macc? Asleep of course (and I dare not startle him, as his head is UNDER the TV cabinet!

Sleepy Macc, originally uploaded by AussiePomm.

------

28 July, 2008

Here it is, the SPA!

OK, so as you know, we have been kinda busy with Chinese Teachers on Home-stay (first a week with two, followed by a week of three) and with the house painting. We now have only two bedrooms to go, so that will be done in a couple of weeks as one bedroom in particular, will have major work to be done with regards to the rendering...

But, as in previous posts, we did say that we would be getting a spa. First there was the purchase, buying the Gazebo (now a Pavilion), pouring of the slab, construction of the Pavilion and finally delivery of the spa. It was a very tight 'squeeze through the Garage (you could here the bubble wrap 'popping' as it went through...) and then up onto the slab. It was no mean feat in getting it there with one of the tyres on the trolley 'popping' and going flat!

When the B.I.L and Co were building the Pavilion, I got L to go to Bunnings to get some electrical cable for some lighting I was intending to do; one externally that the F.I.L found for us, and the other to be above the spa itself for some additional light. This one, a Chandelier, we actually got from IKEA!

Now these photos were taken at around 5pm last night, and was when the sun was going down and the light was low... It was also after a storm we had that left some parts of Sydney with 'Soft Hail' or a rare event of 'Snow'! (Read and see a video here)

Spa in Pavilion

Spa in Pavilion